All change!
So, the weather has changed, and naturally, so have my plans.
I got rather fed up with the scissor crossings. The wiring was ‘fun’, but no impossible, but that wasn’t the deal breaker. The real issue was that I couldn’t get the point motors to align in a sane way. They either clashed with eachother, or with the board framework. So, I decided enough was enough, and they have now been replaced with ordinary points. The motors for those fit in fine, and the wiring issue is gone; now I just need insulating joiners to work with the electrofrogs.
The joiners ended up costing me a lot more than I planned. It seems Dapol have had a class 67 model coming for a while, and whilst looking around on the web for the joiners, I found the pre-orders for these fine new models. So I’ve got a 67 in EWS livery, and, the one I really wanted, a 67 with MK3 coaches and DVT in Wrexham and Shropshire livery! So that’s pleased me no end. Hopefully it’ll fit in the platform.
Progress overall has slowed a little, but now my issue with the scissors is gone, I can plod on far more easily. I need to solder power connectors onto some more point motors, and re-lay some of the track, but I’m not a million miles from wiring up the power. Next it’ll be onto ballast, and we’ll actually be getting somewhere.